MSPCL Recruitment 2016: 434 Vacancies for Jr Technical Assistant, Switch Board Jr Assistant Posts

Manipur MSPCL Notification 2016 : Jr Technical Assistant, Switch Board Jr Assistant Group-IV Posts

Manipur State Power Company Limited  (MSPCL) is inviting suitable and eligible candidates for Junior Establishment Assistant, Switch Board Assistant, Watchman cum Cleaning Assistant and Jr Technical Assistant through direct recruitment.

Total Number of Vacancies: 434 

Name of the Post:

  • Jr Technical Assistant Group-IV: 200 Posts
  • Junior Establishment Assistant Group-III: 32 Posts
  • Switch Board Jr Assistant Group-IV: 100 Posts
  • Watchman cum Cleaning Assistant Group-IV: 34 Posts
  • Switch Board Assistant Group-III: 68 Posts

Application Fee:

  • General/ OBC Candidates: Rs. 200/-
  • SC/ ST candidates: Rs. 50/-
  • Candidates will pay fees by cash. No need to pay application fee by differently abled candidates.

Age Limit as on 01-07-2015: Candidates age should be between 18 years to maximum 38 years for Unreserved.

Educational Qualification: Class XII passed or its equivalent/ Matriculation or its equivalent & Electrician/ Wireman Trade Certificate. Refer to notification.

Selection Process: Through written examination, typing test, personality test & interview.

How to Apply: Eligible and interested candidates can submit their applications along with all required documents to the Receipt/ issue Counter of MSPCL, Corporate Office, Keishampat, Imphal West-795001

Important Dates:

  • Last Date for Submission of Application: 23-December-2015

Advertisement and Application Form Link Details: For more detail Please visit official recruitment notification http://wp-content/uploads/2015/12/it-copy.pdf


Manipur State Power Company Limited

The establishment of the electricity in the Manipur State was on 1930. With the beginning of 2 micro hydel power stations that have already the specifications of 56KW and 100 KW. Till the five years the ability of the 2 power stations were exact same. Between Leimakhong and Imphal an 11KV transmission line was set up to evacuate power from those power stations since the state that needed 26 km of 11 KV traces which have the household lines to function the amount of users.

Manipur State Power Company Limited is dealing with the two micro hydel power stations yet somehow in the future the power stations were dealt with Public Works Departments, Government of Manipur. From 1970 the commitments of the power stations were set apart from Public Works departments in conclusion it began to function it on their own. In the year 1971 the highest load necessity of Manipur was basically 3.6 MW. This necessity was happy from the State’s own producing stations as well as electrical power purchased from the neighboring Electricity Boards at minimal voltage. Until the year 1980 the requirement was very little. The circumstance changed after the state started out bulk power purchase from Assam. This kind of was triggered with the agreement of 132 KV inter-state transmitting line from Imphal to Dimapur which has been throughout the year December 1981 also it was 132/33 KV sub-station at Yurembam. Moreover in the year 1984 the project called NHPC’s Hydro Electric power was commenced on the top of the capability of 105 MW.

Depending on the state the complete hooked up capacity of the state possessed generating station is 45.11 MW that was determined in the year 2012-2013. The principal goals of the group would be to mostly pay attention to require along with the supply of the network progress as well as additional target is usually to set endeavours into the computerization of billing for the useful billing which transforms secure along with good recovery. The group recruits numerous applicants on an annual basis. The interested applicant who enjoys to be employed in electricity relevant work can easily submit an application for the job.

Leave a Reply

Your email address will not be published. Required fields are marked *